SPECIFICATION OF CONSTRUCTION WORK INCLUDES WITH THE ABOVE PROPOSAL
1. FOUNDATION AND SUPERSTRUCTURE:
Earth digging for foundation up to a depth of 5 feet from Ground Level. Anti-termite treatment will be done by at the stage of foundation.
A. PLINTH HEIGHT- 2 Feet above Front Road Level
B. FLOOR HEIGHT - Plinth to slab height of the building’s 10 Feet
2. R.C.C STRUCTURE WORK RATIO:
Foundation RCC work – 1:1.5:3(M20), Plinth Beam- 1:1.5:3 (M20), Column 1:1.5:3 (M20) & slab 1:1.5:3 (M20).
Vibrator used & Mixture machine will be used for proper mixing & smoothening of the concrete.
3. BRICK WORK:
9” Thick brick wall for Outer Wall and 4½’’ thick wall for internal Wall partitions.
4. PLASTER WORK
A- Internal wall: 1:5 (Cement: Sand Ratio) with normal finish
B. External wall: 1:5(Cement: Sand Ratio) with normal finish.
CIVIL WORK MATERIALS SPECIFICATION
S.N. | Material Particulars | Quality of Material (Brand name) |
---|---|---|
1 | Cement | Birla/ Prism - Trade / Non-Trade |
2 | Steel (TMT Bar) | Kamdhenu NXT |
3 | Bricks | 1st quality |
4 | Sand | Coarse sand for concrete work, brick Work & plastering. |
5 | Aggregate | 1st quality (10mm,20mm,40mm as required) |
ELECTRICAL (as per drawing)
All Electrical work includes wall cutting, electrical fitting, wiring, switch board, Main Electric board, MDB, MCB, as per Drawing.
S.N. | Material Particulars | Quality of Material (Brand name) |
---|---|---|
1 | Copper Wires | KEI or KENT |
2 | Switches & Sockets | Anchor Rider |
PLUMBING (as per drawing)
All Sanitary and Plumbing work in this above construction work includes CP Fitting, Sewer Line Connection
S.N. | Material Particulars | Quality of Material (Brand name) |
---|---|---|
1 | CPVC Pipe and CPVC Fittings | Prince |
2 | SWR Pipe and SWR Fittings | Prince |
FLOORING (as per drawing)
All Flooring work includes Tiles/ Granite work
S.N. | Material Particulars | Quality of Material (Brand name) |
---|---|---|
1 | 2'*2' Vitrified Tiles up to Rs. 45 per Sq. Ft | Somani/ Kajaria |
2 | Staircase- Marble/Granite up to Rs. 80 per sq. Ft | As per client choice |
2 | Parking Tiles- Anti Skid up-to Rs. 35 per sq.ft. | As per client choice |
DOORS & WINDOW (as per drawing)
S.N. | Material Particulars | Quality of Material (Brand name) |
---|---|---|
1 | Frame & Chaukhat | MS Pipe (4” x 2.5” size) for all doors |
2 | Main Entrance Door | Membrane door with Laminates (7' * 3') Up-to INR 9,000/- including fittings |
3 | Internal Doors | Flush Doors (7' * 3') with Laminates (Up-to INR 5,500/- including fittings) |
4 | Windows | UPVC Window 2 Track with 5mm Glass Shutter Up-to INR 350 per sq.ft |
5. PUTTI PRIMER
S.N. | Material Particulars | Quality of Material (Brand name) |
---|---|---|
1 | 2 Coat Putti and One coat of primer and two enamel paints on all wood Work and grills | Putti - Birla, Enamel Paint - Asian |
2 | 2 Coat Putti, One coat suitable primer for outer walls | Putti - Birla, Primer - Asian |
3 | 2 Coat Putti, One coat suitable primer for inner walls | Putti - Birla, Primer - Asian |
MS & SS WORK (as per drawing)
All MS Work includes Window Grill, Balcony Railing, Staircase Railing, Ventilator Grill
S.N. | Material Particulars | Quality of Material (Brand name) |
---|---|---|
1 | Window & Ventilator Grill | MS Pipe @ 1.2kg per sq.ft. |
2 | Staircase Railing | Basic MS Pipe Railing |
2 | Balcony Railing | Basic MS Pipe Railing |
BATHROOM (as per drawing)
S.N. | Material Particulars | Quality of Material (Brand name) |
---|---|---|
1 | Wall Tiles | 7 feet height ceramic tiles up-to Rs. 45 per sq.ft. |
2 | Floor Tiles | Vitrified tiles up-to Rs. 45 Per sq.ft. |
3 | Sanitary Fittings | EWC upto Rs. 5000/- (Cera/Parryware) |
4 | CP Fittings | Wall Mixer, Normal Basin, Shower, Towel Rail, Soap Dish, Health Faucet - Up to Rs. 10,000/- (Cera) |
KITCHEN (as per drawing)
S.N. | Material Particulars | Quality of Material (Brand name) |
---|---|---|
1 | Wall Tiles | Up-to 2 feet above kitchen slab (up-to Rs. 45 per sq.ft.) |
2 | Floor Tiles | Vitrified tiles up-to Rs. 45 Per sq.ft. |
3 | Kitchen Slab | Granite Up-to INR 130 per sq.ft. |
4 | Sink | Stainless Steel IncludingFaucet Up-to Rs. 3000 |
NOTE :
1. Additional work will be charge extra as per market rate.
(Additional Work - Low roof, RCC Wardrobe, Glass Roof, water tank, Front elevation, Bore- Well, Roof Parapet wall, Boundary Work, Paint. Soil /Sand Filling, Sewer Line Connection.)
2. Foundation super structure work will be charge extra as per structure design.
3. Architectural Design Service will be charge extra.
4. Site Supervision by our civil engineer.
5. Water & Electricity shall be provided by client.